Linear integration

Connect Linear so teams, issues, and cycles feed flow metrics in Leanmote.

The Linear integration is the planning-side data source for teams that prefer Linear over Jira. It supports the same flow metrics — throughput, cycle time, WIP, waiting time — and substitutes Linear cycles for Jira sprints in Sprint Efficiency.


​

What Leanmote pulls from Linear


​

  • Teams you select.

  • Issues with state-change history.

  • Cycles with start, end, and committed-scope snapshots.

  • Estimates and labels used in metrics.


​

Connect Linear


​

  1. Open Administration → Integrations.

  2. Find Linear under Project Management and click Connect.

  3. Sign in to your Linear workspace.

  4. Authorize the requested scopes.

  5. Select the teams to include.

  6. Click Save.


​

Status mapping


​

Linear states map cleanly to Leanmote's active/waiting model out of the box (Backlog → backlog, Started → active, Canceled → excluded, etc.). Custom states need to be classified once after connection — open the Linear integration's status mapping inside Administration → Integrations.


​

Cycles vs. sprints


​

Linear cycles play the same role as Jira sprints in Sprint Efficiency. The first two completed cycles establish the baseline.


​

Common issues


​

  • Estimates not showing — confirm your team uses an estimation scale; teams without one will have empty Story Points.

  • Triage state included as active — re-classify Triage as a waiting state in the integration's status mapping.


​