Skip to main content

Building a view in Context

Does this apply to you? Look at your sidebar. If it has a Context entry, yes. If it still lists Performance Delivery, Project Financials and AI Return separately, your organization hasn't moved yet — read Creating a View and Editing and filtering Views instead.


​

What is Context? explains what a view is. This article is about shaping one: which tabs it holds, what each tab shows, and how to keep it tidy once it exists.


​

Adding a tab


​

Open a view and select Add a tab, or select the + on the view's row in the Context table. You get three options, and they answer different needs.


​

Templates are ready-made tabs from each area — Workflow Performance, DORA, Team Collaboration Network, Team Overview, QA, Support, Capacity, Team Allocation, Investment balance, CAPEX/OPEX, AI Usage, Sessions, AI Impact, AI ROI, AI Agents and Harness Optimization. Add the ones your question needs. A template you can't add is either one your organization turned off in Settings → Modules, or one your permissions don't cover — adding Project Financials or Investment tabs takes permission to manage Project Financials.


​

Create your own builds a tab from the metrics you pick, across areas. This is the one that answers a question no single template does: merged PRs beside AI sessions, say.


​

AI report writes a narrative analysis of the view's data instead of charts. It's covered in its own article.


​

Tabs can be reordered by dragging, and removed from the ⋮ menu on the tab. Removing a tab you built doesn't lose it immediately — you can undo it.


​

Summarize this tab with AI, in the same ⋮ menu, writes a short AI report of what that tab shows and adds it as a new tab, named Report: and the tab's name. It uses the dates the view is showing. It's on the Workflow Performance, DORA, Team Collaboration Network, Team Overview, QA, AI Usage and AI Impact templates, and on the tabs you build. Only people who can edit the view see it.

​

Copy to another view, in the same ⋮ menu, adds the tab at the end of another view you can edit: pick it from the list, or type its name to find it. The tab goes as it is — a template with the metrics chosen in Edit metrics, a tab you built with its metrics and its name (with a number if the other view already has that name), an AI report as it reads now. A view holds each template once: a view that already has it shows already has it and can't be picked. A template you couldn't add to that view can't be copied there either. Chart types and time units stay those of the other view. Select Open view in the message to go straight to the copy.


​

Choosing what a tab shows


​

Every tab, template or not, has Edit metrics. It opens a drawer listing everything that tab can show, with a count at the top: 12 of 18 metrics shown.


​

Two things are worth knowing before you start unticking:


​

  • Changes apply right away, for everyone who sees the view. There is no save button and no draft. If the view is shared, your co-workers' next refresh shows your choice.

  • Reset to default brings back the full set, so experimenting is cheap.


​

If you hide every metric on a tab, the tab says so rather than rendering empty — turn some back on to see it again.


​

Showing a time in hours or days


​

Times — Cycle Time, Time to Merge, Lead Time and the rest — show by default in minutes, hours or days, whichever fits: days above one day, hours below it, minutes under an hour. Charts show days, and the bar that splits the time by status reads like the card.


​

To fix one in hours or in days, open the card's ⋮ → Change time unit, or select the clock icon next to the filter in the time column of a table (a Show Details, Team Overview, Support). Pick Hours, Days or Minutes, hours or days (default).


​

  • It applies to the whole metric in the view. The card, its chart, the bar that splits the time by status, its Show Details (the Aging work in progress chart included) and the tables that show it change together.

  • Everyone who sees the view sees it in that unit, as with Edit metrics. Only people who can edit the view can change it.

  • A day is the same day as before. For times measured in working hours (flow, QA and Support times, when your organization counts working hours) a day is 8 working hours; for clock times (reviews and DORA) it is 24 hours.


​

Building your own tab


​

Create your own opens a builder with two halves: what's in the tab, and a catalogue to add from.


​

You can describe what you want in a sentence and Leanmote assembles it — "how much we deliver and how PR reviews are going" — or pick the metrics by hand. Either way you can switch: I'd rather pick the metrics myself and Build it from a sentence go both directions, and once a tab exists you can ask for a change in words (add Throughput) or edit it by hand.

​

You can also attach files with the + in the box: an image and up to two documents — a PDF (up to 20 pages), a Word or Excel file (.docx, .xlsx), or a .md, .txt or .csv — 3 MB in all. A list of indicators, a spec or a screenshot of a dashboard is read as part of what you ask for, and the tab is built with every metric of Leanmote's that shows it. The figures always come from your data, never from the file, and the file isn't kept. It works the same in an AI report, in a new view and in a tab's chat. An old .doc or .xls has to be saved as .docx or .xlsx first.


​

For each metric you choose:


​

  • Size — Small (one of the tab's three columns), Medium (two) or Full width. Some metrics are always full width.

  • Chart — where a metric can be drawn more than one way: Card, Number or Trend.

  • Order — drag by the dotted handle on the left.


​

One limit worth knowing in advance: a tab combines metrics from at most six different tabs. If you ask for more, Leanmote builds what fits and tells you what it left out, rather than failing.


​

A custom tab keeps its earlier versions. If a change turns out wrong, open its history and restore the one you want.


​

Renaming, pinning, archiving


​

From a view's menu: Open, Pin to sidebar, Duplicate, Share, Archive and Delete.


​

Pinning is what makes a view a destination — pinned views sit in the sidebar under Context, one click away. Unpinning doesn't delete anything; the view stays in the Context table.


​

Duplicate copies the view with its tabs, which is the fastest way to make a variant: same tabs, different teams.


​

Archive takes a view out of the way without destroying it. Delete is permanent and removes the view for everyone it was shared with — it says so before it does it.


​

A note on what a view is for


​

A view is cheap to make and cheap to throw away. The useful ones tend to be shaped like a question somebody actually asks on a cadence — how is Lending doing on reviews and AI? — rather than a catalogue of everything available. If a view has fifteen tabs, it's usually two views.


​

Related articles


​

  • What is Context?

  • Filters in a Context view

  • Sharing a Context view

Did this answer your question?