Waiting Time

Accumulated time items spend in non-active workflow states.

Waiting Time is the accumulated time items spend parked rather than being worked on. It's the most direct way to surface workflow friction.


​

What it measures


​

The hours items sat in a status your board maps to the Waiting category, summed across the items the team completed in the period. Work still in flight contributes nothing until it finishes.


​

How Leanmote calculates it


​

Leanmote walks each completed item's status history and adds up every stretch that began in a Waiting status:


​

Status category

Counts toward Waiting Time?

Backlog (0)

No

Active (1)

No — that's Active Time

Waiting (2)

Yes

Done (3), Cancelled (4)

No


​

  • There is no built-in list of "waiting" state names. Leanmote does not look for blocked or qa_pending; it looks at the category you assigned to each status in the board status mapping. A status named "Blocked" that you mapped to Active counts as active work.

  • Stretches are clipped to the window you selected, so an item that waited across the boundary contributes only the part inside it.

  • The average divides by every completed item, including the ones that never waited at all.


​

The metric is reported as a total and an average, both in hours. It is not reported as a percentage of cycle time — the percentage view is a separate metric, Flow Efficiency, which is active ÷ (active + waiting) and lives in Strategic Overview.


​

See where the waiting went


​

Show waiting tasks on the card lists the completed items that waited, the longest wait first. For each one you see its project, work item type, parent task, current status and how long it waited, plus a bar with the time it spent in each Waiting status. Above the table, the card's total is split by status, and those bars add up to the card. Click a status in that bar to see, in every row, only the time the item spent in it; click it again to see every status. The columns have filters, and the list exports to CSV.


​

How to interpret it


​

  • Compare Waiting Time against Active Time on the same items. If waiting dwarfs active, the system is mostly queueing and the fix is in the process, not in the coding.

  • If Waiting Time is rising while Cycle Time is rising, the bottleneck is in a passive status.

  • Localize by stage. The status with the longest waiting share is the highest-leverage target.


​

What to do about it


​

  • If review is the longest wait: shorten review pickup time, set SLAs, distribute reviewer load.

  • If QA is the longest wait: invest in test automation and pre-merge quality gates.

  • If deploy is the longest wait: deploy more often or remove manual gates.

  • Cap WIP — fewer items in flight means less waiting per item.


​

If the number looks wrong


​

The most common cause is mapping, not measurement. A status nobody categorized, or one categorized as Active when the team treats it as a queue, moves hours from one bucket to the other. Check the board status mapping before concluding the workflow changed.


​

Related metrics


​

  • Active Time

  • Cycle Time

  • Flow Efficiency — the same two numbers expressed as a ratio

  • Work in Progress (WIP)

  • Bottleneck Insights dashboard